Footpaths and cycle tracks > Outdoor classroom

Project: Landscaping: outdoor classroom at North Binfields
Client: Hampshire County Council
Value: £34,000

The Council’s aim was to open up an area of unmanaged, and previously inaccessible, mature conifer woodland to provide an educational resource for local schoolchildren.

Landscaping project > Outdoor classroom at North Binfields Works included: vegetation management; clearance of vegetation from site for future play area; construction of an outdoor classroom.

Initial tree works:
  • bat survey, bat-sensitive tree felling.
  • lowering hedge height.
  • tree inspections for health and safety.
Soft landscaping:
  • 1,000 transplants/shrubs.
  • 10 standard trees.
  • 100 aquatic plants.
Hard landscaping:
  • 60m boardwalk.
  • 140m woodland path (h/w chips).
  • 100m explorers’ trail.
  • 120sqm pond with decking.
 
    Legal Notice »
© 2007 UPM Tilhill. All Rights Reserved.